2013/05/13
PRESS RELEASE: EEX Transparency Platform to be Expanded with Power Market Data from Switzerland – swisselectric becomes New Part… read more »
2013/03/19
PRESS RELEASE: Renault makes use of EEX Transparency Data for New Electric Car Leipzig, 19 March 2013 – The French car manuf… read more »
2013/05/13
PRESS RELEASE: EEX Transparency Platform to be Expanded with Power Market Data from Switzerland – swisselectric becomes New Partner Bern/Leipzig, 13 May 2013 . The European Energy Exchange (EEX) and... read more »
2013/03/19
PRESS RELEASE: Renault makes use of EEX Transparency Data for New Electric Car Leipzig, 19 March 2013 – The French car manufacturer Renault utilizes data from the Transparency Platform operated by European... read more »
2013/01/22
PRESS RELEASE: Review of 2012: “Transparency in Energy Markets” continuously expanded and on track for REMIT Berlin, Dortmund, Vienna, Leipzig, Bayreuth, Stuttgart, 22 January 2013 – In the third year... read more »
2012/11/16
Updated Data and New Calculation of Data Coverage Rates (QIV/2012): German and Austrian transmission system operators have updated the installed capacities for wind and solar power units for the statutory section of... read more »
2012/11/15
EEX expands Transparency Platform with Generation Data from Bulgaria Companies use transparency platform to fulfil REMIT requirements Leipzig, 15 November 2012 – The European Energy Exchange (EEX) will expand the... read more »
2012/10/11
EEX Transparency Platform to Provide First Data for Power Generation from Biomass: Leipzig, 11 October 2012 – From now on, the "Transparency in Energy Markets" transparency platform of the European Energy... read more »
2012/10/11
Vattenfall Europe AG provides data for new generation unit Boxberg Block R: Since 09 August, Vattenfall Europe AG reports generation data for its new generation unit Block R (lignite) at the location Boxberg with a... read more »
2012/10/01
EEX welcomes Wacker Chemie AG as a new generation data provider: Wacker Chemie AG started to provide generation data to the platform “Transparency in Energy Markets“ on 2012/09/28. EEX welcomes Wacker Chemie AG... read more »
2012/09/26
Temporary change of status of the non-usabilities by GDF SUEZ: Due to technical changes GDF SUEZ will set on 2 October 2012 from 10:00 hour all planned and unscheduled non-usabilities ≥ 100 MW to... read more »
2012/08/16
PRESS RELEASE: EEX integrates Energy Market Data from the Czech Republic in Transparency Platform Implementation of Czech data on “Transparency in Energy Markets” platform completed – ČEZ Group provides... read more »
2012/08/16
Updated Data and New Calculation of Data Coverage Rates (QIII/2012): German and Austrian transmission system operators have updated the installed capacities for wind and solar power units for the statutory section of... read more »
2012/08/03
RWE Power provides data for new generation unit Neurath F: Since today, 3 August, RWE Power AG reports generation data for its new generation unit Neurath F (1,050 MW, lignite) in the statutory and voluntary... read more »
2012/08/02
System outage E.ON: Due to technical issues, E.ON is currently unable to send messages to the EEX transparency platform. All messages are affected since 1st August 2012 6:00 pm. E.ON is currently working on a... read more »
2012/07/09
RWE Power provides data for new generation unit Neurath G: Since 8 July, RWE Power AG reports generation data for its new generation unit Neurath G (1,050 MW, lignite) in the statutory and voluntary section. The... read more »
2012/06/01
EEX welcomes SWB as a new generation data provider: Today, swb Erzeugung GmbH & Co. KG, started to provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes SWB as 44th data... read more »
2012/05/23
Updated Data and New Calculation of Data Coverage Rates (QII/2012): German and Austrian transmission system operators have updated the installed capacities for wind and solar power units for the statutory section of... read more »
2012/05/22
EEX welcomes Saarstahl AG as a new generation data provider: On 21st May 2012, Saarstahl Aktiengesellschaft, started to provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes... read more »
2012/05/08
PRESS RELEASE EEX creates Solution for Market Participants in Fulfilling REMIT Reporting Requirements. Leipzig, 8 May 2012 – The European Energy Exchange (EEX) responds to the chal-lenges of a market... read more »
2012/04/27
[Update] Technical issues E.ON (technical problem with a non-usability message): Due to technical issues, E.ON is currently unable to update one of their messages for the “Planned non-usability of generating units... read more »
2012/03/01
Deregistration of Power Plants: With effect from 1 March, RWE Power AG deregistered its power plant units Frimmersdorf I and K with a total volume of 264 MW on the transparency platform. Data for those power plant... read more »
2012/02/16
Updated Data and New Calculation of Data Coverage Rates (QI/2012): German and Austrian transmission system operators have updated the installed capacities for wind and solar power units for the statutory section of... read more »
2012/02/03
EEX welcomes Mark-E Aktiengesellschaft, Hagen as a new generation data provider: Today, Mark-E started to provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes Mark-E as 41st... read more »
2012/01/25
SWM Services GmbH reports additional generation units: Today, SWM Services GmbH has started to provide additional generation data for its co-generation unit Freimann (160 MW) to the platform “Transparency in... read more »
2012/01/11
2011 in Retrospect: “Transparency in Energy Markets” improved continuously: Generation data from Austria – In total 40 reporting companies for the market area Germany/Austria – 94 % data coverage for Germany... read more »
2012/01/04
Vattenfall Europe provides data for additional pumped storage units: Since 2 January, Vattenfall Europe AG reports voluntarily generation data for their pumped storage units Geesthacht (120 MW) and Hohenwarthe... read more »
2012/01/04
EEX welcomes PCK Raffinerie GmbH as new generation data provider: On 2 January, PCK Raffinerie GmbH has started to provide generation data to the platform “Transparency in Energy Markets“. After VW and BASF, PCK... read more »
2011/12/20
EEX Transparency Platform will be extended to data for Czech Republic in early 2012: CEZ to contribute data to the voluntary section – technical and contractual preparation already underway on both sides – data... read more »
2011/12/19
EEX welcomes Linz Strom GmbH as new generation data provider: Today, Linz Strom GmbH has started to voluntarily provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes Linz Strom... read more »
2011/11/30
EEX welcomes Grenzkraftwerke GmbH as new generation data provider: Today, Grenzkraftwerke GmbH has started to voluntarily provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes... read more »
2011/11/28
Deregistration of Power Plants: With effect on 27 November, RWE Power AG deregistered its power plant units Frimmersdorf C, D and G with a total volume of 383 MW on the transparency platform. Data for those power... read more »
2011/11/16
Updated Data and new calculation of Data Coverage Rates: As routine, transmission system operators updated the installed capacities for generating units smaller than 100 MW for the statutory section on 15 November.... read more »
2011/11/02
EEX welcomes BASF AG as new generation data provider: Today, BASF AG GmbH has started to provide generation data to the platform “Transparency in Energy Markets“. Therewith, further data for the scheduled and... read more »
2011/10/24
Decommissioning of nuclear power units: The four operators E.ON, ENBW, RWE and Vattenfall Europe submitted today the last data for those nuclear power units that are concerned from the decommissioning obligation of... read more »
2011/10/11
EEX welcomes Salzburg AG as new generation data provider: Today, Salzburg AG has started to voluntarily provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes Salzburg AG as first... read more »
2011/07/25
PRESS RELEASE : Austria’s Electricity Companies publish Power Plant Data on EEX Transparency Platform Ten reporting companies – 98,81 % coverage in the field of power plant data right from the outset – APG... read more »
2011/07/14
Update for Unscheduled non-usabilities on 13th July 2011: Yesterday, 13th July, numerous reports got updated on the Transparency Website with respect to non-usabilities. The update was relating to: •... read more »
2011/07/05
EEX welcomes VW Kraftwerk GmbH as new generation data provider: Today, VW Kraftwerk GmbH has started to provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes VW Kraftwerk GmbH as... read more »
2011/05/19
EEX welcomes Kraftwerke Mainz-Wiesbaden AG as new generation data provider: Today, Kraftwerke Mainz-Wiesbaden AG has started to provide generation data to the platform “Transparency in Energy Markets“. EEX... read more »
2011/05/17
EEX welcomes DREWAG - Stadtwerke Dresden GmbH as new generation data provider: Today, DREWAG - Stadtwerke Dresden GmbH has started to provide generation data to the platform “Transparency in Energy Markets“. EEX... read more »
2011/05/16
Update of installed wind and solar capacities: Beyond statutory provisions German Transmission System Operators have updated the installed capacities for wind and solar energy units. Compared to the previously... read more »
2011/04/04
Update of coverage rate: The coverage rate of the transparency platform for the statutory publication requirements has increased from 88.72 to 89.73 per cent in the past weeks. Reason for this increase was the... read more »
2011/03/10
EEX welcomes Vorarlberger Kraftwerke AG as new generation data provider: Today, Vorarlberger Kraftwerke AG (VKW) has started to voluntarily provide generation data to the platform “Transparency in Energy Markets“.... read more »
2011/02/17
EEX welcomes Stadtwerke Duisburg AG as new generation data provider: Today, Stadtwerke Duisburg has started to provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes Stadtwerke... read more »
2011/01/11
EEX Transparency Platform expanded with Austria: The Association of Austrian Electricity Companies launches co-operation with the EEX transparency platform – Power plant data for Austria added in the framework... read more »
2011/01/06
The coverage rate of the transparency platform for the statutory publication requirements has increased to about 89 per cent in the recent weeks. Reason for this rise was the reporting start by GDF Suez Deutschland on... read more »
2010/12/21
EEX welcomes GDF SUEZ Energie Deutschland as new generation data provider: Today, GDF SUEZ Energie Deutschland has started to provide generation data for its German operations to the platform “Transparency in Energy... read more »
2010/12/21
EEX welcomes Heizkraftwerk Halle-Trotha GmbH as new generation data provider: Today Heizkraftwerk Halle-Trotha GmbH has started to voluntarily provide generation data to the platform “Transparency in Energy... read more »
2010/12/07
EEX welcomes envia THERM GmbH as new generation data provider: Today, envia THERM GmbH has started to voluntarily provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes envia THERM... read more »
2010/12/06
Maintenance: Due to scheduled maintenance work of the transparency platform, the access to the data will be limited between 2010-12-09, 7.00 pm (CET), and 2010-12-10, 12.00 pm (CET). The data may be incomplete during... read more »
2010/12/03
Incomplete display of data: Due to a disturbance of the website transparency platform’s data are only incompletely displayed. This applies to all statutory and voluntary publications. EEX works on the... read more »
2010/11/25
Successful first Year of the EEX Transparency Platform: Platform firmly established on the market – More transparency in market pricing – Data offered supplemented with solar energy data – Participation from... read more »
2010/11/22
Missing wind and solar power data: Due to an outage of the data delivery system of TSO TenneT (previously: transpower), there is no data available of the expected production of wind and solar energy since 20th... read more »
2010/11/18
EEX welcomes N-ERGIE Aktiengesellschaft as new generation data provider: Today, N-ERGIE Aktiengesellschaft has started to voluntarily provide generation data to the platform “Transparency in Energy Markets“. EEX... read more »
2010/11/18
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/11/18 02:30pm (CET) until 05:00pm (CET) the displayed data may be temporarily incomplete. Affected areas are: Planned... read more »
2010/11/16
Update of installed capacities incomplete: Transmission System Operator TenneT has informed EEX that an update was not possible for the sum of installed capacities for generating units larger or equal 1 MW and smaller... read more »
2010/11/12
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/11/13 09:00am (CET) until 01:00pm (CET) the displayed data may be temporarily incomplete. Affected areas are: Planned... read more »
2010/11/11
Update of installed capacities - Following statutory provisions, Generation Companies (GenCos) and Transmission System Operators (TSOs) update the installed capacities for generating units by 15 November. This is done... read more »
2010/11/11
Data Gaps filled - Gaps in the transparency data, which had occurred due to the recent technical disturbance, are filled. Two incidents of small extent remain open which have, however, their causes in technical... read more »
2010/11/08
EEX welcomes Stadtwerkle Duesseldorf as new generation data provider: Today, Stadtwerke Duesseldorf has started to provide generation data to the platform “Transparency in Energy Markets“. EEX welcomes Stadtwerke... read more »
2010/11/05
The technical faults, which have considerably limited the operation of the transparency platform, could not be resolved yet. Faults in the software have been identified as the cause of the disturbance which will now... read more »
2010/11/02
Ongoing Disturbance of Transparency Platform - This concerns all statutory and voluntary publications as well as all information products which are based on them. EEX regrets any inconvenience connected with the... read more »
2010/11/02
Data only incompletely available: Due to technical difficulties there is currently only an incomplete amount of data available on the transparency platform. This applies to all statutory and voluntary publications.... read more »
2010/11/01
Data incomplete: due technical difficulties there is currently only an incomplete amount of data available on the transparency platform. This applies to all statutory and voluntary publications. EEX works... read more »
2010/10/28
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/10/29 06:00pm (CET) until 2010/11/01 06:00am (CET) the displayed data may be temporarily incomplete. Affected areas... read more »
2010/10/26
EEX welcomes Evonik Steag as new generation data provider: Today, Evonik Steag has started to provide generation data for its German operations to the platform “Transparency in Energy Markets“. EEX welcomes... read more »
2010/10/26
Update of coverage rate: The coverage rate of the transparency platform for the statutory publication requirements decreases temporarily from present 92.67 to 80.53 per cent. The coverage rate is the result of the... read more »
2010/10/26
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/10/27 09:00pm (CET) until 2010/10/28 01:00am (CET) the displayed data may be temporarily incomplete. Affected areas... read more »
2010/10/12
Maintenance: Due to scheduled maintenance work of the transparency platform, the access to the data will be limited between 2010-10-15, 8.00 pm (CET), and 2010-10-18, 9.00 am (CET). The data may be incomplete during... read more »
2010/10/11
Missing solar power data: Due to a disturbance of the data provision of TSO Amprion, there is no data available of the expected production of solar energy for the 11th October. Amprion is working to resolve the... read more »
2010/10/11
Outage of data transmission: Due to technical disturbance of the data transmission unit, there is no data available for the statutory and voluntary publications of E.ON since 9th October. This concerns an installed... read more »
2010/10/07
Missing wind and solar power data: Due to an outage of the data delivery system of TSO TenneT (previously: transpower), there was no data available of the expected production of wind and solar energy since 6 October.... read more »
2010/09/23
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/09/21 09:00am (CET) until 2010/09/21 12:00pm (CET) the displayed data may be temporarily incomplete. Affected areas... read more »
2010/09/20
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/09/21 05:00pm (CET) until 2010/09/21 07:00pm (CET) the displayed data may be temporarily incomplete. Affected areas... read more »
2010/09/20
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/09/21 02:00pm (CET) until 2010/09/21 06:00pm (CET) the displayed data may be temporarily incomplete. Affected areas... read more »
2010/09/15
EEX welcomes Statkraft Markets as new generation data provider: Today, Statkraft Markets has started to provide generation data for its German operations to the platform “Transparency in Energy Markets“. EEX... read more »
2010/09/08
Maintenance: Due to scheduled maintenance work of the transparency platform, the access to the data will be limited between 2010-09-10, 8.00 pm (CET), and 2010-09-13, 9.00 am (CET). read more »
2010/09/06
Inconsistent treatment of pump storage and seasonal storage capacities: Plausibility checks by EEX have shown on 6th September that pump storage and seasonal storage capacities of some 1,600 MW have been announced as... read more »
2010/09/03
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/09/03 05:00pm (CET) until 2010/09/06 09:00am (CET) the displayed data may be temporarily incomplete. Affected areas... read more »
2010/08/30
Data improvements for generation capacities under Renewable Energy Act: German Transmission System Operators will complement the previous data for the Ex-ante information on the total installed generating capacity... read more »
2010/08/23
Correction for update notifications: Routine plausibility checks of the so far around 70,000 reports on the transparency platform have in some individual cases demonstrated a faulty allocation of update reports. In... read more »
2010/08/16
Maintenance window dispatcher: Due to a maintenance window of one of the dispatchers between 2010/08/17 08:00am (CET) until 2010/08/17 10:00am (CET) the displayed data may be temporarily incomplete. Affected area... read more »
2010/07/19
“Transparency in Energy Markets“ now including data on solar energy Bayreuth, Berlin, Dortmund, Leipzig, Stuttgart, 19 July 2010 – From today data on the generation of electricity from solar energy will also... read more »
2010/05/26
Successful record of the platform six months after its establishment – High degree of coverage – Reporting companies and access to the platform are increasingly consid-erably – Further reporting companies will... read more »
2009/12/21
Dear Sir or Madam, The web site www.transparency.eex.com for generation data in the power segment has been available for the public since 30 October 2009. The new platform “Transparency in Energy Markets“... read more »
2009/10/28
Dortmund, Leipzig, Stuttgart, Bayreuth, Berlin, 28th October 2009 - In the framework of their commitment to transparency in European energy trading European Energy Exchange AG (EEX) and the four German transmission... read more »
2009/06/15
Leipzig, Stuttgart, Bayreuth, Dortmund, Berlin, 15th June 2009 – In co-operation with European Energy Exchange AG (EEX), the four German transmission system operators (TSOs) EnBW Transportnetze AG, transpower... read more »