Mainnavigation
- Information
- Statutory Publication Requirements of the Transmission System Operators
- Power generation
- Installed generation capacity ≥ 100 MW
- Installed generation capacity < 100 MW
- Planned non-usabilities of generating units of ≥ 100 MW
- Unscheduled non-usabilities of generating units of ≥ 100 MW
- Summary of the planned and unscheduled non-usabilities ≥ 100 MW
- Planned production by generating units of ≥ 100 MW
- Expected wind power generation
- Expected solar power generation
- Actual production of generating units of ≥ 100 MW
- Actual wind power generation
- Actual solar power generation
- Power consumption
- Power generation
- Voluntary Commitment of the Market Participants
You have no Flashplayer or an older Version. To use all functions you have to install Flashplayer 9. Click here to install flash.

