Mainnavigation
Installed generation capacity ≥ 100 MW
Ex-ante information on the installed generation capacity and forecasts regarding the maximum available energy of power generating units with a net nominal output of ≥ 100 MW
This data is updated by the power plant operators once they have the changed information – usually in the course of the year; however, at the latest on 15th November every year. At that time, the information regarding the third following year is also published for the first time.
The maximum available energy is calaculated with the help of the prescribed calculation rules (see glossary).