Unscheduled non-usabilities of generating units of ≥ 100 MW
Ex-post information regarding unscheduled non-usabilities of generating units with a net nominal output of ≥ 100 MW
In as far as the non-usable output is not reported by the power plant operator in the framework of the reported non-usabilities, it has to be classified as unscheduled. The unscheduled non-usabilities are published with a maximum delay of two hours.
Please note: The unscheduled non-usabilities messages (NUMs) are continously updated. The reporting time shows therefore the last update.