Mainnavigation
- Information
- Statutory Publication Requirements of the Transmission System Operators
- Power generation
- Installed generation capacity ≥ 100 MW
- Installed generation capacity < 100 MW
- Planned non-usabilities of generating units of ≥ 100 MW
- Unscheduled non-usabilities of generating units of ≥ 100 MW
- Summary of the planned and unscheduled non-usabilities ≥ 100 MW
- Planned production by generating units of ≥ 100 MW
- Expected wind power generation
- Expected solar power generation
- Actual production of generating units of ≥ 100 MW
- Actual wind power generation
- Actual solar power generation
- Power consumption
- Power generation
- Voluntary Commitment of the Market Participants
You have no Flashplayer or an older Version. To use all functions you have to install Flashplayer 9. Click here to install flash.
- CZ
Unscheduled non-usabilities of generating units of ≥ 1 MW
Ex-post information regarding unscheduled non-usabilities of generating units with a net nominal output of ≥ 1 MW
In as far as the non-usable output is not reported by the power plant operator in the framework of the reported non-usabilities, it has to be classified as unscheduled. The unscheduled non-usabilities messages are reported with a maximum delay of one hour. The reporting companies are in charge of timely reporting.
The minimum requirements for non-usabilities are at least an amount of 1 MW and a duration of at least 15 minutes.
Please note: The minimum requirements for non-usabilities are at least an amount of 1 MW and a duration of at least 15 minutes.
For the day
2013/05/18
1 result found.